ABOUT THIS PROJECT

CJ Foods, located in Bern, KS is a dog food processing plant.  This project was to provide needed space for expansion.  The project consisted of 2 new buildings being added to the existing facility, as well as renovation work to the existing building.

The 1st building is 8,370 square foot that consists of a loading dock area, an 1,800 square foot freezer, and a meat processing facility. It is a pre-engineered metal building that connects to the south side of the existing facility.

The 2nd building is a 1,898 square foot pre-engineered metal building storage facility that connects on the east side of the existing facility. Both have concrete foundations and slab on grade with tin walls and roof.  There were also 3 new dock locations with levelers.

Project Details
Type:
New Construction
Status:
Completed
Role:
General Contractor
Owner:
C. J. Foods, Inc.
Size:
10,268 SF
Architect:
N/A

BRINGING PROJECTS TO REALITY

With over 47 years of experience, AHRS Construction, Inc. has developed a sense of leadership and responsibility with many dedicated employees. We share our customer’s pride and satisfaction in bringing to reality a project that meets both their needs and expectations in a timely and economical manner. We invite you to contact our team today to take the next steps in your construction project!

© 2017 AHRS Construction Inc. All Rights Reserved.