In Progress

 
Hiawatha Streetscape - Phase III

Hiawatha, Kansas

Street Improvements

Role
General Contractor

Owner
City of Hiawatha, Kansas

Description
This project involves the removal and replacement of sidewalks, curb and guttering. New water services are also ran to businesses in the area and street light improvements made with decorative light poles installed. 

Contract Amt
$853,561

Size
0.165 miles Net Length Renovated

Completion
Anticipated Completion: July 2017

Architect
Engineers: KDOT/BG Consultants, Inc. - Manhattan, Kansas

 
St. Gregory the Great Catholic Church - Addition & Renovation

Marysville, Kansas

Religious

Role
General Contractor

Owner
The Roman Catholic Archdiocese of Kansas City in Kansas

Description
St. Gregory the Great Catholic Church proceeded on the construction of a new brick church patterned after the old St. Gregory's Church that used to stand as a milestone in Marysville, Kansas prior to its demo in 1975. Prior to this project, their existing church and parish hall facilities were connected on one site. To build the new church facility, the existing parish hall building was demolished to make way for the new church while the existing church remained operational. Upon completion of the new church facility, the existing church was then remodeled to become the parish hall. The new church is a traditional Gothic building with a bell/clock tower and steeple that measures 112' to the top. The structure is a pre-engineered metal building with a dark red brick covered facade with light limestone trims and a standing seam metal roofing system. A new entrance/foyer with similar architectural details is provided at the front of the new parish hall that links to the new church. Stained glass windows surround the buildings. Interior finishes include drywall and acoustical plaster ceilings that rise to a 57' height at the peak in the Nave. A wood panel wainscot surrounds the Nave. GFRP trims are included throughout the church. Flooring includes porcelain tile and terrazzo at the commons areas within the church and resinous flooring in the parish hall, restrooms, and kitchen. The choir area is carpeted. Rooms within the new church include the Nave to seat 602 people, narthex, a 550 SF chapel, an elevator, vesting & working sacristies, reconciliation room and choir loft. The parish hall includes a 4,000 SF hall, 1,000 SF kitchen, quilting room, bridal dressing room and new restroooms. 

Contract Amt
Private Entity - Contract Confidential

Size
13,000 SF new construction; 10,750 SF remodel

Completion
Anticipated Completion: Spring 2018

Architect
HTK Architects - Topeka, Kansas

 
Valley View Milling - Office Addition

Seneca, Kansas

Metal Buildings

Role
General Contractor

Owner
Valley View Milling

Description
An 8,640 square foot Pre-Engineered metal building with a total of 4,500 square feet of office space. The ground level has 1,500 square feet of office space along with warehouse and shop space. The second floor and basement level make up the remainder of the office space. A loading dock sits on the north side of the building.      

Contract Amt
Private Entity - Contract Confidential

Size
8,640 SF

Completion
Anticipated Completion: June 2017

Architect
Dan Stallbaumer

 
Armbruster Motors - Addition

Falls City, Nebraska

Retail/Service

Role
General Contractor

Owner
Armbruster Motors

Description
A 7,225 square foot shop addition and 2,115 square foot office addition to the existing building. Pre-engineered metal building structure will include 9 new bays with hydraulic lifts, a new show room and a parts room. 

Contract Amt
Private Entity - Contract Confidential

Size
9,350 SF

Completion
Anticipated Completion: May 2017

Architect
Larry Chilese Architects - Lincoln, Nebraska