Finished - Manufacturing/Industrial

 
HF Rubber Machinery - Rubber Mixer Manufacturing Plant

Topeka, Kansas

Manufacturing/Industrial

Role
General Contractor

Owner
HF Rubber Machinery

Description
A new 62' x 302' pre-engineered metal building will house a state of the art rubber mixer manufacturing plant. The new structure will be located just north of plant 3. With the addition of this plant, HF Rubber Machinery will move their head quarters to Topeka, Kansas. The building is 45' tall to accomodate a massive 60 ton free standing crane system with three 10 ton sister cranes. This building will also contain a semi truck trailer loading area, three shutle areas, a water testing area, five mixer assembly bays, a parts storage area, an enclosed paint booth, multiple inspection areas, and a sand blast booth. New offices, restrooms, break room and customer meeting room will line the south wall of the plant. A new east entry and asphalt drive into this complex will give this building multiple avenues of accessibility. Also, the existing employee parking lot will be resurfaced.

Contract Amt
$1,000,000

Size
18,875 square feet new construction

Completion
November 2013

Architect
Schwerdt Design Group - Topeka, Kansas

 
Magnolia Metal - East Building Addition/Remodel

Auburn, Nebraska

Manufacturing/Industrial

Role
General Contractor

Owner
Magnolia Metal

Description
This project consists of a new 4,000 square foot addition on to the east side of the existing facility. It is a pre-engineered metal building atop concrete foundations and slab on grade. The new space will be used for manufacturing purposes with jibs being installed and equipment being moved in. There will be a maintenance area with an office along with storage and (2) docks. The existing space will be demolished and new equipment and jibs moved in.

Contract Amt
-

Size
4,000 square feet new construction and renovation of existing building

Completion
March 2013

Architect
N/A

 
CJ Foods - Freezer/Meat Room Addition

Bern, Kansas

Manufacturing/Industrial

Role
General Contractor

Owner
CJ Foods

Description
This project consists of (2) new buildings added to the existing facility as well as some minor renovation work upon completion of the new buildings. The 1st building is 8,370 square foot that consists of loading dock area, a 1,800 square foot freezer and a meat processing facility. It is a pre-engineered metal building that connects to the south side of the existing facility. The 2nd building is a 1,898 square foot pre-engineered metal building storage facility that connects on the east side of the existing facility. Both have concrete foundations and slab on grade with tin walls and roof. (3) new dock locations with levelers.

Contract Amt
-

Size
10,268 square feet new construction

Completion
January 31, 2013

Architect
N/A

 
Koch and Company Addition to South Plant

Seneca, Kansas

Manufacturing/Industrial

Role
Concrete & Steel Erector Subcontractor

Owner
Koch and Company

Description
37,250 square foot addition to the cabinet manufacturing company. With this expansion, four additional Dock doors were added. The walls of this addition are STAR Building Systems' Dura-rib panels and the roof is a Starshield Standing Seam roof. A unique aspect of this building is a 10' deep x 12" thick concrete foundation on the entire north side of the building. It was constructed to facilitate a future office addition that will be partially below grade. This project is the 7th addition AHRS Construction, Inc. has completed for Koch and Company in the last 10 years.

Contract Amt
-

Size
37,250 square feet new construction

Completion
March 31, 2011

Architect
-